dj whitebread
Friday, August 29, 2008
Shower
The handyman guy is putting the final touches on the siding outside. That's right... we have a functional shower again. It has been exactly three weeks since we stopped using our shower. I am very happy that this is all done.
The amusing thing was the plumbing repair took literally 10 minutes. The shower pipe just had to be reconnected. That was it. However, getting there took a little longer.
There was the outside siding. Then foam insulation. Then the original masonite siding, which had to be sawed through. Then backer board, which had to be sawed through. Then finally, the puffy fiberglass insulation that just got pulled off... and then, there were the pipes. Amazing... all that for such a simple fix. Our next residence needs to have special plumbing access doors. This is ridiculous.
But, the net effect is that I have a shower. Thank God.
9:50 AM |